Construction Bidding Platform

View current projects open for bidding, with access to design documents and details needed to prepare your bid. These opportunities build on our legacy of delivering quality design and lasting community infrastructure.

Available Projects

Showing 15 of 26 projects

Winterville - Powell Bill Paving

Bidding Land Subdivision And Development
Pre-Bid Date Jul 05, 2026
Bid Date Jul 28, 2026

The Project includes the following Work: 1. 5,460 SY of Mill and Overlay 2. 2,600 LF of Curb Milling 3. Eight (8) Manhole Ring Adjustments 4. Three (3) Valve Box Adjustments 5...

View Details

Washington County - Roper Interconnection

Award in Progress Water Infrastructure
Pre-Bid Date Jun 29, 2026
Bid Date Jul 21, 2026

Project includes the replacement of three (3) existing interconnections, five (5) elevated tank static mixers, and one (1) ground storage tank static mixer.

View Details

Edgecombe Co. - Kingsboro Waterline Extension

Award in Progress Water Infrastructure
Pre-Bid Date Jun 28, 2026
Bid Date Jul 23, 2026

The Project includes the following Work: 1. 6,725 LF of New 16-inch PVC Water Main; 2. 80 LF of New 16-inch DIP Water Main; 3. 700 LF of New 16-inch Fusible PVC Water Main insta...

View Details

City of Lumberton - Linkhaw Road Flood Mitigation

Award in Progress Stormwater Infrastructure
Pre-Bid Date May 26, 2026
Bid Date Jun 09, 2026

The Project includes the following Work: 1. Removal and reinstallation of railroad , ballast and ties for installation of two (2) – 60 LF long 7’ x 4’ box culverts with concrete h...

View Details

Town of Plymouth - Water Street Sidewalk Improvements

Award in Progress Community Development
Pre-Bid Date May 20, 2026
Bid Date May 28, 2026

The Project includes the following Work: 1. Sidewalk/Streetscape Improvements along both sides of Water Street between Washington St and Adams St.

View Details

Cumberland County Expo Center - Chiller Replacement

Award in Progress Building New Or Renovations
Pre-Bid Date May 06, 2026
Bid Date May 15, 2026

 

View Details

Cumberland County Agri Center - Boiler Addition

Award in Progress Building New Or Renovations
Pre-Bid Date May 06, 2026
Bid Date May 15, 2026

 

View Details

City of Lumberton - Production Wells 11, 12 & 13

Award in Progress Water Infrastructure
Pre-Bid Date Apr 05, 2026
Bid Date May 14, 2026

The Project includes the following Work: Construction of production well sites, including, but not limited to: Site work, structures, well head, well construction, pump installat...

View Details

Town of Edenton - Paradise Road Waterline Extension

Award in Progress Water Infrastructure
Pre-Bid Date Mar 29, 2026
Bid Date Apr 29, 2026

The Project consists of the following major items: 1. 2,800 LF of New 8-inch C-900 PVC Water Main. 2. 1 New Fire Hydrant Assembly. 3. 450 SY of Clearing and Grubbing. 4. 15 LF ...

View Details

Town of Jonesville - Water Treatment Plant Improvements

Award in Progress Water Infrastructure
Pre-Bid Date Mar 26, 2026
Bid Date May 12, 2026

The Project includes the following Work: 1. Rehabilitation of 200,000 Gallon 64-foot Diameter concrete Clearwell. 2. Two story filter building addition approximately 22 feet x ...

View Details

Smithfield - I-95 Gravity Sewer Crossing and PS No. 11 Replacement

Completed Wastewater Infrastructure
Pre-Bid Date Mar 03, 2026
Bid Date Apr 02, 2026

The Project includes the following Work: 1. Demolition and Replacement of PS No. 11 2. Abandonment of existing 8-inch gravity sewer and installation of 16-inch gravity sewer from...

View Details

Town of Princeville - Town Hall Parking Lot Improvements

Completed Community Development
Pre-Bid Date Mar 01, 2026
Bid Date Mar 12, 2026

The Project consists of the following major items: • Remove and Replace 1,600 SY of Asphalt • Remove and Replace Existing Concrete Sidewalk • Remove and Replace Curb and Gutt...

View Details

Town of Pinetops Water System Improvements

Completed Water Infrastructure
Pre-Bid Date Feb 26, 2026
Bid Date Mar 12, 2026

The Project includes the following work: 1. Replace approximately 20,100 LF of 6-inch main 2. Replace approximately 2,700 LF of 8-inch main 3. Replace approximately 17,900 LF of...

View Details

Town of Ronda - Elkin Highway Water Main Extension

Completed Water Infrastructure
Pre-Bid Date Feb 19, 2026
Bid Date Mar 24, 2026

The Project includes the following Work: 1. Installation of 5,223 LF of 12-inch C900 PVC & 136 LF of 12-inch DIP water line with all associated appurtenances 2. Installation of 6...

View Details

Oxford - 2017 USDA Water & Sewer Improvements, Contract No. 2

Completed Water Infrastructure
Pre-Bid Date Feb 16, 2026
Bid Date Feb 24, 2026

The Project includes the following Work: 1. 11,200 linear feet of 8 to 21-inch sanitary sewer replacement and appurtenances 2. 2,200 linear feet of 8 to 15-inch sanitary sewer re...

View Details
Project Name Location Pre-Bid / Bid Date Project Type Status

Winterville - Powell Bill Paving

The Project includes the following Work: 1. 5,460 SY of Mill and Overlay 2. 2,600 LF of Curb Milling 3. Eight (8) Manhole Ring Adjustments 4. Three (3) Valve Box Adjustments 5. One (1) Pavement Striping: Stop Bar 6. 60 CY of Undercut

Town of Winterville

Pre-Bid: Jul 05, 2026

Bid: Jul 28, 2026

Land Subdivision And Development Bidding

Washington County - Roper Interconnection

Project includes the replacement of three (3) existing interconnections, five (5) elevated tank static mixers, and one (1) ground storage tank static mixer.

Washington County, NC

Pre-Bid: Jun 29, 2026

Bid: Jul 21, 2026

Water Infrastructure Award in Progress

Edgecombe Co. - Kingsboro Waterline Extension

The Project includes the following Work: 1. 6,725 LF of New 16-inch PVC Water Main; 2. 80 LF of New 16-inch DIP Water Main; 3. 700 LF of New 16-inch Fusible PVC Water Main installed by Directional Drill; 4. 8 New Fire Hydrant Assemblies; 5. 7 New 16-inch Gate Valves; 6. 10,200 LB of New 16-inch Fittings; 7. Connect to 2 Existing Water Mains; 8. Cleanup and Seeding Along Utility Pipelines; 9. Erosion Control; 10. Miscellaneous Appurtenances.

Edgecombe County

Pre-Bid: Jun 28, 2026

Bid: Jul 23, 2026

Water Infrastructure Award in Progress

City of Lumberton - Linkhaw Road Flood Mitigation

The Project includes the following Work: 1. Removal and reinstallation of railroad , ballast and ties for installation of two (2) – 60 LF long 7’ x 4’ box culverts with concrete headwalls. Installation of bioswale and native grasses planted along existing channel.

Lumberton

Pre-Bid: May 26, 2026

Bid: Jun 09, 2026

Stormwater Infrastructure Award in Progress

Town of Plymouth - Water Street Sidewalk Improvements

The Project includes the following Work: 1. Sidewalk/Streetscape Improvements along both sides of Water Street between Washington St and Adams St.

Town of Plymouth

Pre-Bid: May 20, 2026

Bid: May 28, 2026

Community Development Award in Progress

Cumberland County Expo Center - Chiller Replacement

Cumberland County

Pre-Bid: May 06, 2026

Bid: May 15, 2026

Building New Or Renovations Award in Progress

Cumberland County Agri Center - Boiler Addition

Cumberland County

Pre-Bid: May 06, 2026

Bid: May 15, 2026

Building New Or Renovations Award in Progress

City of Lumberton - Production Wells 11, 12 & 13

The Project includes the following Work: Construction of production well sites, including, but not limited to: Site work, structures, well head, well construction, pump installation, piping and all associated appurtenances. Includes the following well sites: Well Site #11, Well Site #12, and Well Site #13

City of Lumberton

Pre-Bid: Apr 05, 2026

Bid: May 14, 2026

Water Infrastructure Award in Progress

Town of Edenton - Paradise Road Waterline Extension

The Project consists of the following major items: 1. 2,800 LF of New 8-inch C-900 PVC Water Main. 2. 1 New Fire Hydrant Assembly. 3. 450 SY of Clearing and Grubbing. 4. 15 LF of New 24-inch Corrugated Plastic Pipe with New 24-inch Flared-In Section. 5. Miscellaneous Appurtenances (Erosion Control, Tapping Sleeve & Valve, Reducer, etc.)

Town of Edenton

Pre-Bid: Mar 29, 2026

Bid: Apr 29, 2026

Water Infrastructure Award in Progress

Town of Jonesville - Water Treatment Plant Improvements

The Project includes the following Work: 1. Rehabilitation of 200,000 Gallon 64-foot Diameter concrete Clearwell. 2. Two story filter building addition approximately 22 feet x 28 feet. a. Addition will include two (2) 9 feet by 10 feet gravity filters b. Associated site work 3. Rehabilitation of the existing two (2) 9 ft x 10 ft gravity filters 4. SCADA system components

Town of Jonesville

Pre-Bid: Mar 26, 2026

Bid: May 12, 2026

Water Infrastructure Award in Progress

Smithfield - I-95 Gravity Sewer Crossing and PS No. 11 Replacement

The Project includes the following Work: 1. Demolition and Replacement of PS No. 11 2. Abandonment of existing 8-inch gravity sewer and installation of 16-inch gravity sewer from Ex. SSMH No. 2A to SSMH No. 7, totaling approximately 1,153 LF, which includes 326 LF of 30" Steel Encasement with 16-inch gravity sewer by bore and jack under I-95. 3. Installation of 16-inch gravity sewer from Ex. SSMH No. 2017 to Ex. SSMHA No. 2A, totaling approximately 309 LF of sewer.

Town of Smithfield

Pre-Bid: Mar 03, 2026

Bid: Apr 02, 2026

Wastewater Infrastructure Completed

Town of Princeville - Town Hall Parking Lot Improvements

The Project consists of the following major items: • Remove and Replace 1,600 SY of Asphalt • Remove and Replace Existing Concrete Sidewalk • Remove and Replace Curb and Gutter • Pavement Striping

Town of Princeville

Pre-Bid: Mar 01, 2026

Bid: Mar 12, 2026

Community Development Completed

Town of Pinetops Water System Improvements

The Project includes the following work: 1. Replace approximately 20,100 LF of 6-inch main 2. Replace approximately 2,700 LF of 8-inch main 3. Replace approximately 17,900 LF of 12-inch main 4. Replace approximately 140 gate valves ranging from 6-12 inches 5. Remove 60 fire hydrant assemblies 6. New 67 fire hydrant assemblies 7. Replace 236 service connections 8. Miscellaneous appurtenances

Town of Pinetops

Pre-Bid: Feb 26, 2026

Bid: Mar 12, 2026

Water Infrastructure Completed

Town of Ronda - Elkin Highway Water Main Extension

The Project includes the following Work: 1. Installation of 5,223 LF of 12-inch C900 PVC & 136 LF of 12-inch DIP water line with all associated appurtenances 2. Installation of 6' x 8' Pressure Reducing Valve Vault with all associated appurtenances

Town of Ronda

Pre-Bid: Feb 19, 2026

Bid: Mar 24, 2026

Water Infrastructure Completed

Oxford - 2017 USDA Water & Sewer Improvements, Contract No. 2

The Project includes the following Work: 1. 11,200 linear feet of 8 to 21-inch sanitary sewer replacement and appurtenances 2. 2,200 linear feet of 8 to 15-inch sanitary sewer rehabilitation 3. 6,200 linear feet of 2 to 6-inch water main replacement and appurtenances

City of Oxford

Pre-Bid: Feb 16, 2026

Bid: Feb 24, 2026

Water Infrastructure Completed

Ready to Start Bidding?

Registration is free and takes less than 5 minutes.